At the M50 construction site, the building clearly reflects the original design intent.
The project preserves the original structural frame while renewing the facade and modernizing the building systems; a combination that will significantly reduce the building's energy use and operating costs.
The south facade features building-integrated photovoltaics that feel like a natural part of the design rather than an afterthought.
Associate and Project Manager Oliver Mehl led a site tour highlighting construction progress while enjoying remarkable views across Berlin from the 20th floor.